EnglishDeutschFrançaisEspañolItalianoNederlandsPortuguesREAD THESE INSTRUCTIONS CAREFULLY BEFORE INSTALLATION.KEEP THIS MANUAL IN A HANDY PLACE FOR FU
8 English• If wiring from the piping side, wire as shown in the figure below.CAUTION• Be sure to attach the sealing material or putty (field supplied)
English 99-2 WIRING EXAMPLE • Fit the power supply wiring of each unit with a switch and fuse as shown in the drawing. COMPLETE SYSTEM EXAMPLE (3 SYST
10 EnglishWiring Method (See ‘‘ELECTRIC WIRING WORK’’)(3) Remove the electric parts box lid(4) Add remote control 2 (slave) to the terminal block for
(0905) HT3P086154-2P EM02A085B00_CV_3P086154-2P.fm Page 2 Tuesday, March 31, 2009 5:33 PM
Umeda Center Bldg., 2-4-12, Nakazaki-Nishi,Kita-ku, Osaka, 530-8323 JapanDAIKIN INDUSTRIES, LTD.EN60335-2-40,DAIKIN.TCF.022E1/10-2007TÜV Rheinlard EPS
English 1VRV SYSTEM Inverter Air Conditioners Installation manualCONTENTS1. SAFETY PRECAUTIONS... 12. BEF
2 English• Do not install the air conditioner in the following locations:1. Where there is a high concentration of mineral oil spray or vapour (e.g. a
English 3FOR THE FOLLOWING ITEMS, TAKE SPECIAL CARE DURING CONSTRUCTION AND CHECK AFTER INSTALLATION IS FINISHED.a. Items to be checked after completi
4 English4. PREPARATIONS BEFORE INSTALLA-TION(1) Positioning of holes for fastening to the wall(2) How to open / close the front panel1. Open the lid
English 5(4) Use the following procedure to mount the remote con-troller (optional accessory) on the unit is so desired. (FXLQ type only)• Open the le
6 EnglishCAUTIONCAUTION TO BE TAKEN WHEN BRAZING REFRIGER-ANT PIPINGDo not use flux when brazing refrigerant piping. Therefore, use the phosphor coppe
English 7CAUTION• Drain piping connectionsDo not connect the drain piping directly to sewage pipes that smell of ammonia. The ammonia in the sewage mi
Komentáře k této Příručce