Daikin FVQ140CVEB Instalační manuál Strana 11

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 32
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 10
10 English
1. How to carry out refrigerant piping.
Detach the pipe retainer. (Refer to Fig. 12)
In case of left or right piping
1. Open the knock out holes on the right (left) side panel. (Refer to Fig. 11)
2. Carry out piping (refrigerant and drain) and wiring (connecting outdoor and indoor units) through the
holes on the side panel.
(See dimensions shown in Fig. 15 for forming refrigerant piping.)
In case of rear piping
1. Open the knock out holes on the rear panel. (Refer to Fig. 14)
2. Carry out piping (refrigerant and drain) and wiring (connecting outdoor and indoor units) through the
holes on the rear panel.
(See dimensions shown in Fig. 15 for forming refrigerant piping.)
CAUTION
In case of rear side piping, be careful not to damage fan motor lead wire.
When opening the knock out hole, be careful not to damage fan motor lead wire with the steel plate cut
off. (Refer to Fig. 16).
In case of downward piping
1. Cut holes in the indicated area of the bottom frame. (Refer to Fig. 14)
2. Carry out piping (refrigerant and drain) and wiring (connecting outdoor and indoor units) through the
holes on the bottom frame.
CAUTION
Be careful not to damage fan housing when piping.
Fan housing is made of foamed polystyrene.
Be careful not to damage the fan housing with pipe edge when installing indoor unit.
Bottom frame
Knock out holes for piping (Select either one)
(left and right side panels and rear panel)
Through holes for wiring (Select either one)
(left and right side panels)
Side panel
Fig. 11
* Put the attached hole protection rubber (3) ( )
after making the opening.
* Put the attached bush (4) ( ) after making the opening.
3P249378-4D_FM6.book Page 10 Thursday, December 15, 2011 10:00 AM
Zobrazit stránku 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 31 32

Komentáře k této Příručce

Žádné komentáře