Daikin BRC1E51A7 Uživatelský manuál Strana 22

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 58
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 21
20 English
Ventilation Operation
When Air Conditioner Interlocked with Total Heat Exchanger
Preparation
For mechanical protection purposes, turn ON the system at least six hours before starting the
operation of the system.
Do not turn OFF the system in season in order to ensure the smooth starting of the system.
Operation Method
1
Set temperature
20°C
Vent
Return Setting
Set the Operation mode selector button
to Ventilation in the case of operating
the total heat exchanger without the
system between seasons.
2
To change the ventilation mode setting, make
necessary settings from the main menu (see page 33).
Ventilation mode: Automatic, Heat exchange, and Bypass*
3
To change the ventilation rate, make necessary
settings from the main menu (see page 32).
Ventilation rate: Low or High*
4
Press On/Off button.
The Operation lamp (green) will be lit
and the system will start operating.
5
The Operation lamp will be turned OFF
and the system will stop operating when
On/Off button is pressed again.
Basic Operation Method (Use of Direct Buttons)
01_EN_EM08A085.indd 2001_EN_EM08A085.indd 20 4/7/2009 4:39:13 PM4/7/2009 4:39:13 PM
Zobrazit stránku 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 57 58

Komentáře k této Příručce

Žádné komentáře